Answer :

Final answer:

To cover 12 positions, 8 hours a day, 7 days a week, it would take approximately 16.8 Full-Time Equivalents (FTEs).

Explanation:

To determine the number of Full-Time Equivalents (FTEs) needed to cover 12 positions, 8 hours a day, 7 days a week, we need to calculate the total number of work hours required.

12 positions * 8 hours/day * 7 days/week = 672 total work hours per week.

Assuming a full-time worker works 40 hours per week, the number of FTEs needed would be:

672 total work hours per week / 40 hours per FTE per week = 16.8 FTEs.