We appreciate your visit to A borrow source material clayey silty sand is proposed for the construction of a 150 000 yd 3 embankment fill Lab results from the testing. This page offers clear insights and highlights the essential aspects of the topic. Our goal is to provide a helpful and engaging learning experience. Explore the content and find the answers you need!
Answer :
The approximate quantity of borrow required to construct the embankment is approximately 15,960 yd³. The quantity of borrow refers to the amount of money or resources that are borrowed or taken on loan.
To calculate the quantity of borrow required to construct the embankment, we need to consider the dry unit weight and moisture content requirements.
1. Calculate the dry unit weight of the borrow material:
The specifications require an in-place dry unit weight of 115#/ft³. The lab result for the moist unit weight (Ymoist) is given as 97.4#/ft³. To find the dry unit weight (Ydry), we need to account for the moisture content (w).
Ydry = Ymoist / (1 + w/100)
Ydry = 97.4 / (1 + 9.3/100)
Ydry = 88.98#/ft³
2. Determine the moisture content range:
The specifications require the embankment to be compacted to an in-place dry unit weight within +/- 2% of the optimum moisture content. Since the moisture content is given as 9.3%, we need to calculate the range for the moisture content.
Moisture content range = +/- 2% of 9.3%
Moisture content range = 0.02 * 9.3
Moisture content range = 0.186%
3. Calculate the maximum and minimum dry unit weights:
Maximum dry unit weight = (1 + Moisture content range) * Ydry
Maximum dry unit weight = (1 + 0.186/100) * 88.98
Maximum dry unit weight = 89.154#/ft³
Minimum dry unit weight = (1 - Moisture content range) * Ydry
Minimum dry unit weight = (1 - 0.186/100) * 88.98
Minimum dry unit weight = 88.806#/ft³
4. Calculate the volume of borrow required:
Volume of borrow required = Embankment volume / (Maximum dry unit weight - Minimum dry unit weight)
Volume of borrow required = 150,000 / (89.154 - 88.806)
Volume of borrow required = 150,000 / 0.348
Volume of borrow required = 431,034.5 ft³
5. Convert the volume to cubic yards:
1 ft^3 = 0.037037 yd³
Volume of borrow required = 431,034.5 * 0.037037
Volume of borrow required = 15,960.33 yd³
Therefore, the approximate quantity of borrow required to construct the embankment is approximately 15,960 yd^3.
To know more about quantity of borrow visit:
https://brainly.com/question/13000760
#SPJ11
Thanks for taking the time to read A borrow source material clayey silty sand is proposed for the construction of a 150 000 yd 3 embankment fill Lab results from the testing. We hope the insights shared have been valuable and enhanced your understanding of the topic. Don�t hesitate to browse our website for more informative and engaging content!
- Why do Businesses Exist Why does Starbucks Exist What Service does Starbucks Provide Really what is their product.
- The pattern of numbers below is an arithmetic sequence tex 14 24 34 44 54 ldots tex Which statement describes the recursive function used to..
- Morgan felt the need to streamline Edison Electric What changes did Morgan make.
Rewritten by : Barada